
I finished rows 4 and 5 of the Paris Metro Subway tiles.

I finished rows 4 and 5 of the Paris Metro Subway tiles.
I moved McKenzie’s Jedi shrine from the old bedroom to her new bedroom. During the transport, the plastic brackets I…
I finished painting the dog silhouettes and names and applied finishing wax to walnut backing boards.
I am starting to create items for my upcoming online store. One of the items will be these trout silhouettes…
The controller stack for the Full Spectrum Laser Muse Laser Engraver and Cutter came back yesterday, and today I finally…
It has been a while since I have been able to putter in the shop. I worked on aligning the…
Today is one of those rare days when I have the opportunity to run all three of my fabricators at…
I installed an exhaust vent for the FSL Muse Laser Cutter and Engraver. I found an removable pipe coupler on…
I continue to work on cutting out the Eiffel Tower on the Muse Laser Engraver and Cutter. Cleaning the lens…
Continuing to progress on the CEIA Magnetometer Storage Dollies The slow part to the whole process is the cutting of…
I worked on a solar charging station with the 60-watt solar panel. With the solar charging station finished and I…
I finally opened my Esty store at https://www.etsy.com/shop/MakerCave, and I received my first order, two Poet’s Quote Trout to Mary…
I put the FSL Muse Laser Cutter and Engraver to work after the installing the new exhaust vent. Jill want…
I installed the second shelf lift. This one is for my belt and disc sander. Two power tools off the…
You must be logged in to post a comment.