March 3, 2019 Shop Log

The crew at the Amphitheater completed all the Type II Barricades they could with the pieces they had. I cut some additional slats and handles for the start of Monday.
Today I had set the goal of removing the drift boat from the ceiling and moving it over to temporary storage. I don’t think that will have today.
I moved a step closer toward completing the Rotating Power Tool Stand. I cut out the side supports for the rotating drum with the X-Carve CNC Router.
I captured this time lapse of the cutting job on the X-Carve CNC Router using a Wyze Security Camera I have mounted above the router.