August 11, 2017 Shop Log

  • I finally completed the fourth CEIA Magnetometers Storage Dolly with the installation of the Battery Storage Box.
  • I moved the fourth CEIA Magnetometers Storage Dolly out of MakerCave to the Amphitheater.
  • I managed to cut two more pairs of yokes for the CEIA Magnetometers.
  • Also stockpiled parts for future CEIA Magnetometers Storage Dollies…
  • The latest addition to the MakerCave Art Gallery…

August 4, 2017 Shop Notes

  • I finished cutting the (8) tabletops for the Amphitheater.
  • Unfortunately while cutting these tabletops on the bandsaw, I dulled the 1/4" blade trying to go through a screw. I installed a 3/16" blade.
  • I put together a new Parking Lot Working Light for the Amphitheater.
  • I wonder if I am so difference from others. I see a problem or an issue, and I work to find a solution. I tend not to ignore it and think someone else will fix it. There was a split seam on one of the ropes at the Amphitheater, and I took it upon myself to repair it. This meant developing a new skill, learning to use a sewing awl.